Our team delivered The King’s Affairs Center as a full turnkey fit-out scope. The work covered all internal finishing and fit-out works, including blockwork, plastering, tiling, suspended ceilings, doors, windows, joinery, partitions, and decorative finishes, along with external façade and architectural finishing works. The scope also included complete MEP works — power distribution, lighting, plumbing, drainage, HVAC, fire protection, and low-current systems — followed by testing, commissioning, and handover. The project was executed under strict safety, quality, and schedule controls, with close coordination with the client and consultants throughout all phases, and the center was handed over fully operational on schedule.